Page 59 - Vol_1_Chapter_III
P. 59

•  External Consultants: Fees for hiring external consultants, specialists, or engineering firms
                      with expertise in retrofitting and automation.
                  •  Training: Costs for training operators and maintenance personnel to work with the new
                      digital system and components.

                  5. Tooling and Fixturing

                  •  Redesigned or New Tooling: The cost of redesigning or manufacturing new tooling, molds,
                      or fixtures to accommodate the retrofit.

                  6. Safety and Compliance

                  •  Safety Upgrades: Costs associated with adding or upgrading safety features, such as sensors,
                      interlocks, guards, and safety-related components, to meet regulatory requirements.

                  7. Electrical and Wiring

                  •  Wiring  and  Cabling:  Expenses  for  rewiring  or  upgrading  the  electrical  system  to
                      accommodate new components and controls.
                  8. Communication and Connectivity

                  •  Networking: Costs for implementing networking infrastructure, communication protocols,
                      and data connectivity.
                  •  IIoT  Integration:  Expenses  related  to  integrating  Industrial  Internet  of  Things  (IIoT)
                      capabilities for data collection and remote monitoring.
                  9. Documentation and Training

                  •  Documentation: Costs for updating manuals, schematics, and documentation to reflect the
                      changes made during the retrofit.
                  •  Training:  Expenses  for  training  personnel  to  operate,  maintain,  and  troubleshoot  the
                      retrofitted machine.

                  10. Downtime and Production Loss

                  •  Potential revenue loss due to downtime during the retrofitting process, especially if the
                      machine is a critical part of production.
                  11. Unforeseen Costs

                  •  Contingency: It's wise to include a contingency budget to account for unforeseen issues,
                      changes, or additional requirements that may arise during the retrofit.

                  It's  important  to  carefully  assess  and  budget  for  each  of  these  cost  considerations  before
                  embarking on a retrofitting project. Working with experienced professionals and consultants
                  can help accurately estimate costs and ensure a successful retrofit that meets your objectives.



                     3.11 Training of personnel


                  Transitioning  personnel  from  operating  a  traditional  forming  machine  to  a  digital  forming
                  machine  involves  imparting  knowledge  and  skills  related  to  new  technologies,  automation,
                  programming, and troubleshooting. The training curriculum should aim to equip operators and





             Copyright © by DIGIGREEN All Rights Reserved     Volume I – Chapter III: Digital and Green Machining and Forming    41
   54   55   56   57   58   59   60   61   62   63   64